1 February 2007

The entire morning was spent "Fleeting" the Boat. That is, flooding the drydock and just barely floating the boat so they could move her aft about 3 feet and then raise her up to clean and paint the area where she sat on the blocks. They started down about 0800 and I didn't get there till 1000 so she was already down. They discovered a small port list that you will see in one of the first pictures. It was do to the side blocks on starboard set to far inboard, so there was some juggling to do. Look carefully in the water and you will see 2 divers in the drydock. Anyway, they got her straighten out as you will see in subsequent photos.

After she was back dry again they resumed the superstructure pressure wash, set some zincs on the hull and commenced working on the wasted metal topside.

DBF Harry


IMG_1119Small.jpg IMG_1121Small.jpg IMG_1128Small.jpg IMG_1132Small.jpg
IMG_1134Small.jpg IMG_1137Small.jpg IMG_1143Small.jpg IMG_1144Small.jpg
IMG_1147Small.jpg IMG_1150Small.jpg IMG_1154Small.jpg IMG_1156Small.jpg